REVOLUTION E – Fachgespräch zur All-Electric-Transformation an der Ladestation
REVOLUTION E

Reduce energy costs.
Prioritise the right investments.

REVOLUTION E is the HSG HUMMEL Service Group division in Frickenhausen for all-electric systems in companies. The All-Electric Site Assessment evaluates electricity, heat, process heat and mobility on site as one integrated system; REVOLUTION E then orchestrates implementation with specialist firms.

A finance-oriented business case for electricity, heat, process heat and mobility. REVOLUTION E combines real site data, commercial scenarios and orchestrated implementation with selected specialist partners.

What You Gain

All-Electric Solutions

Commercial levers become visible when generation, consumption, storage and mobility are assessed as one integrated system.

Make Operating-Cost Impact Transparent

Self-generation, load shifting and intelligent energy management are assessed using actual prices and load profiles – without blanket savings claims.

Control Energy Flows

Monitoring, peak shaving and tariff optimisation create transparency across loads, costs and operational risks.

Four Sectors, One Business Case

Electricity, heat, process heat and mobility are assessed together from both a technical and commercial perspective.

From Pilot to Scalable Roll-out

A prioritised measure is technically defined, implemented with suitable specialist partners and validated before scaling.

Vendor-Independent Orchestration

REVOLUTION E brings together technologies, specialist partners, planning and implementation as one manageable system.

OUR PRINCIPLE

Economics Before Subsidies.

We assess all-electric systems using total cost of ownership: the decisive benchmark is the lowest overall cost across 20 years. Subsidies are used selectively as a CAPEX lever, while the investment decision follows robust operating economics.

TCO
Total Cost of Ownership

Total costs over 20 years as decision basis

IRR
Internal Rate of Return

Capital return as benchmark for investment decisions

DSCR
Debt Service Coverage Ratio

Indicative measure for debt-service capacity and financing discussions

ALL-ELECTRIC SITE ASSESSMENT

Four Sectors.
One Robust Business Case.

Electricity, heat, process heat and mobility must be assessed together. The REVOLUTION E All-Electric Site Assessment connects actual site data, technical measures and commercial metrics to create a clear decision basis for executive management, CFOs and boards.

The free QuickCheck remains the fast starting point. The Site Assessment is the professional core service for a site-specific investment decision.

Free Starting Point

All-Electric QuickCheck

In a few minutes, the QuickCheck provides an initial orientation using industry benchmarks and model assumptions. It indicates potential orders of magnitude for operating costs, CO₂ and investment – without promising individual results.

The QuickCheck uses 11 industry model cases and sample assumptions, without an on-site appointment. The individual Site Assessment including an on-site appointment is a separate service stage.

Sample view of the All-Electric QuickCheck
  • 11 industry-specific sample cases
  • Four sectors at a glance
  • Operating-cost impact, CO₂ and investment range
  • No sensitive customer data required
11Benchmarks
INDUSTRY-SPECIFIC SAMPLE CASES
4Sectors
ELECTRICITY · HEAT · PROCESS HEAT · MOBILITY
5Minutes
INITIAL ORIENTATION
Sample values
NO PROMISE OF INDIVIDUAL RESULTS
View QuickCheck
Site-Specific Decision Basis

REVOLUTION E All-Electric Site Assessment

A finance-oriented business case for electricity, heat, process heat and mobility.

The individual site assessment uses the customer's actual consumption, pricing, building and system data. It evaluates measures and scenarios across all four sectors and clearly separates operating-cost impact, additional revenue potential and overall economics.

€2,490 net plus 19% VAT

Results report within 1–3 working days after complete data collection, including the on-site appointment; we arrange the on-site appointment with you personally.

Book directly via Stripe, without an account. The purchase is completed at Stripe.

  • Validated site and consumption data
  • Electricity, heat, process heat and mobility as one system
  • PV, storage, wind, PPA, heat pumps, infrared heating, process heat, charging infrastructure and energy management
  • Investment, payback, TCO, IRR and DSCR
  • Sensitivities, opportunities and risks
  • Detailed results report, management brief and executive summary for management
  • 15-minute conversation about the results

150+ Parameters

TECHNICAL AND COMMERCIAL INTERDEPENDENCIES

TCO · IRR · DSCR

FINANCE-ORIENTED METRICS

Management Report

FOR EXECUTIVES AND BOARDS

On Site

ACTUAL DATA INSTEAD OF REMOTE ASSUMPTIONS

For commercial and industrial businesses. If you have questions, use the free introductory conversation.

TCO, IRR and DSCR are finance-oriented model outputs based on the data and assumptions captured. They do not replace a credit decision, detailed engineering or a binding quotation.

Discuss Your Site AssessmentView Sample Assessment
PV & Storage
EMS Software
Charging Infrastructure
Heating & Process Heat
Technology Orchestration

Best-in-Class Partners

Your Site. Your Control.

REVOLUTION E orchestrates technologies, specialist partners, planning and implementation. Systems are designed, installed and operated by suitable specialist firms – vendor-independently, with clear interfaces and full data transparency.

Vendor-independent system selection
Clear roles and interfaces
Full data sovereignty
Scalable across additional sites
Monitoring and operational transparency
Open interfaces for your IT landscape
The Decision and Implementation Path

From QuickCheck to Roll-out

01

QuickCheck

Free initial orientation based on industry benchmarks and model assumptions.

→ View QuickCheck
02

All-Electric Site Assessment

Actual data, on-site assessment, scenarios and a finance-oriented business case.

03

Implementation Pilot

Implementation Pilot: concrete work on site, 2–4 weeks following the Site Assessment. REVOLUTION E defines the prioritised measure and orchestrates partner selection, planning and implementation.

04

Roll-out Support

Roll-out support over 12–24 months for transformation across all four sectors, quoted individually.

Partner Ecosystem

We Connect Technologies, Partners and Accountability

REVOLUTION E creates a clear governance structure across technology partners, specialist firms and planning teams – vendor-independent and scalable.

Technology Partners

Suitable systems for PV, storage, charging and EMS

Specialist Companies

Professional design, installation, operation and maintenance

Planning Teams

Technical design, documentation and project management

FAQ

Questions About the Site Assessment

What does the All-Electric Site Assessment cost, and what is included?

The All-Electric Site Assessment includes an on-site appointment, evaluates electricity, heat, process heat and mobility as one integrated system and consolidates the data in a finance-oriented business case covering investment, operating-cost impact, 20-year TCO, IRR and DSCR. The price is €2,490 net plus 19% VAT. Deliverables include a detailed results report, management brief and executive summary, plus a 15-minute conversation about the results. The report follows within 1–3 working days after complete data collection including the on-site appointment; we arrange the on-site appointment with you personally. You can book the Site Assessment directly through Stripe and complete the purchase there. A free introductory conversation remains available as a separate, optional route.

Do you implement the systems yourselves?

REVOLUTION E orchestrates technology partners, specialist firms and planning teams. Design, installation and operation are delivered by the appropriate specialist firms, selected independently of manufacturers and with clear interfaces.

What do TCO, IRR and DSCR mean?

TCO (Total Cost of Ownership) covers all costs of a system over its useful life – notably investment, energy, maintenance and replacement; we consider 20 years. IRR (Internal Rate of Return) describes the internal rate of return calculated from an investment’s cash flows. DSCR (Debt Service Coverage Ratio) compares cash flow available before debt service with interest and principal payments. A value above 1 indicates debt-service coverage in the model, but is not a bank or financing commitment.

What role do subsidies play?

Economics are assessed without subsidies first. Where relevant to the site, subsidies may be included as an assumption that reduces the investment. Considering them does not constitute subsidy advice and does not create either a funding or financing commitment.

Ladestation unter Carport

Ready for a Robust Site Decision?

Together, we clarify which data is already available, which scenarios matter to the decision and whether to begin with the QuickCheck or move directly to an individual site assessment.